To accomplish the task and resolve the issue, a large stimulation barge was built for the project. The NOC engaged Schlumberger 一体化建井 and Software Integrated Solutions with domain expertise to facilitate the process. The technology deployed to accomplish the project included Kinetix reservoir-centric stimulation-to-production software, 深蓝色 seawater-base fracturing fluid, and HiWAY flow-channel fracturing technique. 结果是, the first well delivered 9 days ahead of authorization for expenditure (AFE) target time. The horizontal section of 3,545 ft was drilled at a record ROP. Efforts resulted in the highest number of well stages ever stimulated in a single well offshore, 20 stages, 在连续操作期间.